FACTORY PLAN APPROVAL

Factory Plan Approval Registration

Mandatory under Section 6 of the Factories Act, 1948 before constructing, extending or taking into use any building as a factory. Plans submitted to the Chief Inspector of Factories for health, safety and NBC compliance. Prerequisite for Factory License. New plans, extensions, machinery layout and modifications.

DedicatedExpert Assistance
Section 6Factories Act, 1948
2–3 YearsApproval Validity
NEW FACTORY · EXTENSION · MACHINERY LAYOUT

Get Expert Consultation

Fill out the form to consult our specialists for factory building plan approval by the Chief Inspector of Factories.

100% confidential. No spam, ever.
Thanks! Your consultation request has been received. Our expert will contact you shortly.
SAMPLE

Factory Plan Approval Certificate

Government Authority / MCA — sample official certificate

Illustrative sample. Your official certificate is issued after approval.

01 Section 6 Mandatory No construction or use of a building as a factory without prior plan approval
02 Chief Inspector Approved by the Chief Inspector of Factories / State Factory Inspectorate
03 Before License Plan approval is a prerequisite for obtaining the Factory License
04 2–3 Year Validity Construction must be completed within the validity period or extension sought
OVERVIEW

What is Factory Plan Approval?

Factory Plan Approval is a mandatory requirement under Section 6 of the Factories Act, 1948. The occupier must submit building plans and specifications to the Chief Inspector of Factories (or State Factory Inspectorate) before constructing, extending or taking into use any building as a factory.

Plans are checked for compliance with health, safety and welfare provisions (Sections 11–20), the National Building Code (NBC), and state factory rules — covering ventilation, lighting, fire safety, sanitary facilities, machinery spacing and structural stability. Plans must be prepared by a licensed architect or engineer. Approval is the first step before Factory License registration and commencement of manufacturing.

Law Factories Act, 1948 · Section 6
Authority Chief Inspector of Factories
Standards Act + NBC + State Rules
Validity Typically 2–3 years
WHEN REQUIRED

When Plan Approval is Needed

01

New Factory Construction

Any new building to be used as a factory (10+ workers with power / 20+ without) before construction starts.

02

Extension of Existing Factory

Additions, new wings, additional floors or expanded production areas require fresh plan approval.

03

New Machinery / Layout Change

Installation of machinery or layout changes that affect safety, spacing or structure.

04

Process Change / Relocation

Change in manufacturing process affecting safety or relocation to a new premises — fresh plans required.

PLAN TYPES

Plans Typically Submitted

01

Site Plan

Factory location, boundaries, adjoining roads, north direction and access (typically 1:500).

02

Building Plan

Floor plans, elevations, sections, dimensions, room heights and materials (typically 1:100).

03

Machinery Layout

Position of machines, spacing, aisleways, operator positions and power layout.

04

Services & Safety

Ventilation, fire exits, sanitary facilities, drainage and welfare areas as required.

DOCUMENTS

What You Typically Need

1. Site & Building Plans

Site plan and building plans prepared by a licensed architect/engineer to prescribed scale.

2. Machinery Layout

Detailed layout of machines, spacing and operator positions.

3. Occupier Identity

PAN and Aadhaar (or equivalent) of the occupier / authorised person.

4. Premises Proof

Ownership, lease or allotment documents for the factory site.

5. NOCs (as applicable)

Fire, pollution or other NOCs required by the state before or with the application.

6. Application Form

Form 1 (or state-prescribed form) for permission to construct, extend or use as factory.

PROCESS

How Factory Plan Approval Works

1. Scope & Architect

Define new build, extension or layout change; engage a licensed architect/engineer for plans.

2. Plan Preparation

Site plan, building plan, machinery layout and safety/welfare details to Act and NBC standards.

3. Application Filing

Submit Form 1 (or state form) with plans and documents to the Chief Inspector / State Inspectorate.

4. Scrutiny & Inspection

Authority reviews plans for compliance; may call for clarification or site inspection.

5. Approval Certificate

Approved plans returned with stamp. Construction must follow approved plans; then apply for Factory License.

WHY CHOOSE US

Why Corporate Mart for Plan Approval?

01

Compliance-First Plans

Review against Section 6, health/safety provisions and NBC so plans are not rejected at scrutiny.

02

State Authority Aware

Filing aligned with the Chief Inspector / DISH / DLFE of the relevant state.

03

Architect Coordination

Support so licensed architects prepare site, building and machinery layouts to required scale.

04

License Pathway

Clear handoff to Factory License registration once construction is done as per approved plans.


Plans → Form 1 → Chief Inspector → Approval → Construct → Factory License
FAQ

Frequently Asked Questions

Statutory approval under Section 6 of the Factories Act, 1948 of building and layout plans by the Chief Inspector of Factories before constructing, extending or using a building as a factory.

Yes. No person shall construct, extend or take into use any building as a factory without prior approval of the plans. Unauthorised construction can attract fines, imprisonment and demolition orders.

The Chief Inspector of Factories or the State Factory Inspectorate (e.g. DISH, DLFE) of the state where the factory is located.

Typically site plan, building plan (floors, elevations, sections), machinery layout and details for ventilation, fire safety and welfare facilities. Plans must be by a licensed architect/engineer.

Often 15–30 days depending on the state and completeness of the application. Queries or site inspection can extend the timeline.

Typically 2–3 years. Construction should be completed within this period; otherwise an extension or re-approval may be required.

Yes. Approved plans are a prerequisite. Form 2 (or state equivalent) for license will not be accepted without the Chief Inspector’s plan approval stamp.

Alterations that affect safety, fire escape, ventilation or machinery spacing may require amended plan approval. Always check with the Chief Inspector or a compliance consultant before changing the approved layout.

SECTION 6 · CHIEF INSPECTOR · BEFORE CONSTRUCTION

Factory Plan Approval — Build Only After Approval.

Comprehensive support: plan compliance review, Form 1 filing and Chief Inspector coordination. Mandatory under the Factories Act before constructing or extending a factory. Get approved plans, then proceed to Factory License.

Get Free Consultation →