New Factory Construction
Any new building to be used as a factory (10+ workers with power / 20+ without) before construction starts.
Mandatory under Section 6 of the Factories Act, 1948 before constructing, extending or taking into use any building as a factory. Plans submitted to the Chief Inspector of Factories for health, safety and NBC compliance. Prerequisite for Factory License. New plans, extensions, machinery layout and modifications.
Fill out the form to consult our specialists for factory building plan approval by the Chief Inspector of Factories.
Government Authority / MCA — sample official certificate
Illustrative sample. Your official certificate is issued after approval.
Factory Plan Approval is a mandatory requirement under Section 6 of the Factories Act, 1948. The occupier must submit building plans and specifications to the Chief Inspector of Factories (or State Factory Inspectorate) before constructing, extending or taking into use any building as a factory.
Plans are checked for compliance with health, safety and welfare provisions (Sections 11–20), the National Building Code (NBC), and state factory rules — covering ventilation, lighting, fire safety, sanitary facilities, machinery spacing and structural stability. Plans must be prepared by a licensed architect or engineer. Approval is the first step before Factory License registration and commencement of manufacturing.
Any new building to be used as a factory (10+ workers with power / 20+ without) before construction starts.
Additions, new wings, additional floors or expanded production areas require fresh plan approval.
Installation of machinery or layout changes that affect safety, spacing or structure.
Change in manufacturing process affecting safety or relocation to a new premises — fresh plans required.
Factory location, boundaries, adjoining roads, north direction and access (typically 1:500).
Floor plans, elevations, sections, dimensions, room heights and materials (typically 1:100).
Position of machines, spacing, aisleways, operator positions and power layout.
Ventilation, fire exits, sanitary facilities, drainage and welfare areas as required.
Site plan and building plans prepared by a licensed architect/engineer to prescribed scale.
Detailed layout of machines, spacing and operator positions.
PAN and Aadhaar (or equivalent) of the occupier / authorised person.
Ownership, lease or allotment documents for the factory site.
Fire, pollution or other NOCs required by the state before or with the application.
Form 1 (or state-prescribed form) for permission to construct, extend or use as factory.
Define new build, extension or layout change; engage a licensed architect/engineer for plans.
Site plan, building plan, machinery layout and safety/welfare details to Act and NBC standards.
Submit Form 1 (or state form) with plans and documents to the Chief Inspector / State Inspectorate.
Authority reviews plans for compliance; may call for clarification or site inspection.
Approved plans returned with stamp. Construction must follow approved plans; then apply for Factory License.
Review against Section 6, health/safety provisions and NBC so plans are not rejected at scrutiny.
Filing aligned with the Chief Inspector / DISH / DLFE of the relevant state.
Support so licensed architects prepare site, building and machinery layouts to required scale.
Clear handoff to Factory License registration once construction is done as per approved plans.
Statutory approval under Section 6 of the Factories Act, 1948 of building and layout plans by the Chief Inspector of Factories before constructing, extending or using a building as a factory.
Yes. No person shall construct, extend or take into use any building as a factory without prior approval of the plans. Unauthorised construction can attract fines, imprisonment and demolition orders.
The Chief Inspector of Factories or the State Factory Inspectorate (e.g. DISH, DLFE) of the state where the factory is located.
Typically site plan, building plan (floors, elevations, sections), machinery layout and details for ventilation, fire safety and welfare facilities. Plans must be by a licensed architect/engineer.
Often 15–30 days depending on the state and completeness of the application. Queries or site inspection can extend the timeline.
Typically 2–3 years. Construction should be completed within this period; otherwise an extension or re-approval may be required.
Yes. Approved plans are a prerequisite. Form 2 (or state equivalent) for license will not be accepted without the Chief Inspector’s plan approval stamp.
Alterations that affect safety, fire escape, ventilation or machinery spacing may require amended plan approval. Always check with the Chief Inspector or a compliance consultant before changing the approved layout.
Comprehensive support: plan compliance review, Form 1 filing and Chief Inspector coordination. Mandatory under the Factories Act before constructing or extending a factory. Get approved plans, then proceed to Factory License.